Background:

The Metro project is the largest infrastructure project currently being promoted in Israel, with an estimated value of approximately 150 billion shekels. The project is a core part of the mass transportation system in the Tel Aviv metropolitan area, which also includes light rail lines, BRT lines, shared transportation centers (Hub), and more. The project includes the planning of three underground metro lines (M1, M2, M3) with a total length of 150 km, which will pass through 24 municipalities, 110 underground stations, and is expected to handle around 450 million trips annually.

The Case:

BLK was selected through a tender to serve as the financial consultant for NTA and supports the project in intricate tendering processes, budget management, strategic decision-making, and various operational procedures.

Work Process:

BLK is involved continuously in advising and managing the project in collaboration with NTA. This includes developing Main budget estimates, providing ongoing guidance for the tendering processes related to both financial and strategic aspects, managing the ongoing cash flow, and working on the procurement strategy.

The work is carried out in cooperation with NTA, the Ministry of Finance, the Ministry of Transportation, Network manager, Line Managers, and all other necessary professional levels involved.

x
סייען נגישות
הגדלת גופן
הקטנת גופן
גופן קריא
גווני אפור
גווני מונוכרום
איפוס צבעים
הקטנת תצוגה
הגדלת תצוגה
איפוס תצוגה

אתר מונגש

אנו רואים חשיבות עליונה בהנגשת אתר האינטרנט שלנו לאנשים עם מוגבלויות, וכך לאפשר לכלל האוכלוסיה להשתמש באתרנו בקלות ובנוחות. באתר זה בוצעו מגוון פעולות להנגשת האתר, הכוללות בין השאר התקנת רכיב נגישות ייעודי.

סייגי נגישות

למרות מאמצנו להנגיש את כלל הדפים באתר באופן מלא, יתכן ויתגלו חלקים באתר שאינם נגישים. במידה ואינם מסוגלים לגלוש באתר באופן אופטימלי, אנה צרו איתנו קשר

רכיב נגישות

באתר זה הותקן רכיב נגישות מתקדם, מבית all internet - בניית אתרים. רכיב זה מסייע בהנגשת האתר עבור אנשים בעלי מוגבלויות.